Swimming soon- week 3 and 4


The last few weeks have been a bit slower, so I am combining two posts together. Some of you though may find that plumbing is really interesting, which it actually kinda is, and naturally it wouldn’t be a pool without it. It doesn’t make for the best photo opportunities. All the pipes are in and connected to the water line, and hopefully soon they will begin the tiling and decking. The weather has been beautiful this winter, I think it’s the warmest, sunniest winter since we moved here five years ago, which makes the anticipation of a pool in our backyard all the more exciting, before the hot, summer weather arrives.

Week 4 – Tiling Begins

pool-tile

The tile is in, and we love it. The blue tile against the white coping is perfect. The most common design seemed to be having the coping (the brick that go directly around the pool) match the deck, but we thought the white would offset the tiles. You can be the judge from the pictures, what do you think? The pavers will be with red tones, and that should be happening soon, it will really all come together. I think it’s time to begin shopping for a new bathing suit!

The other pics are of the Red Cross Designer Show House 2012 West Palm Beach. I thought of trying to pass it off as my house, but I have a way to go to have a house like that. Especially, with a husband who lives on a corner of the couch and 3 dogs. With iPads, iPhones and laptops, who needs a desk? You can just live in front of the tennis channel while you are working. I am blogging on my screened in back porch, using my wireless network, so I’m not really one to talk.

showhouse

The house is gorgeous though, it’s in the Old Northwood neighborhood in West Palm Beach which is only a about a mile from my house. I love the gauzy beaded curtains and the pillows made out of Indian sari’s. Those aren’t colors I would have chosen, but they are so bright and cheerful, who wouldn’t love that room?

Advertisements